The Project
- Movement of basement floor in London
- Caused by ground movement
- Tight, restricted space eliminated use of heavy machinery
The Solution
- Floor re-stabilised using 8 x piles and caps
- Installed in one day with minimal disruption to homeowner
- Use of hand-held equipment
Project Details | |
Product | Shire Pile & caps |
Project | Basement Restabilisation |
Project size | 6.1m x 3.7m |
Completed | October 2012 |
Time on site | 1 day |
Depth of piles | 4m |
Number of piles | 8 |