Case Studies for Civil and Structural Engineering – Education
The £2.3m three storey Music School at Yarm School was completed in 2015. The building contains a 130 seat lecture theatre, music practice rooms, recording studio and a glazed link back to the existing school.
The £20M redevelopment at Yarm School which was completed in 2012 included demolition of an existing classroom block and dining room, refurbishment of the existing hall to form a new dining room
The £4.2m building is a three storey landmark new build laboratory facility for molecular cancer research. The building contains laboratories and office facilities.
St Catherines CE Primary School is a £5.6m new build primary school in Kidderminster.
The £1.5m refurbishment of the Library at Kings School, Worcester was completed in 2006 and won 2 Wood Innovation Awards for the design of the internal fit out in 2007.
The £7m, 4 storey Keyes Building for King’s School, Worcester was completed in 2015. The Building contains a multi-use sports hall, exercise and weights room,
The new £2m boathouse at the King’s School in Worcester is a two storey steel framed structure located adjacent to the River Severn.
The extension to the existing Hagley Primary School comprised construction of a new 12 classroom block along with a new Hall.
The Hospitality Suite at Bromsgrove School forms one building in a £10m Sports project which was completed in 2013.