The Project
The £790,000 development at Homs Road comprised nine terraced dwellings across three plots. The two / three storey timber framed houses were built to the Code of Sustainable Homes Level 3. The substructure was piled due to poor ground conditions.
Gallery
![](https://www.shire-uk.com/wp-content/uploads/2019/04/homs-road-5-1024x655.jpg)
![](https://www.shire-uk.com/wp-content/uploads/2019/04/homs-road.jpg)
![](https://www.shire-uk.com/wp-content/uploads/2019/04/homs-road-1-1024x681.jpg)
![](https://www.shire-uk.com/wp-content/uploads/2019/04/homs-road-2-1024x656.jpg)
![](https://www.shire-uk.com/wp-content/uploads/2019/04/homs-road-7-1024x660.jpg)
![](https://www.shire-uk.com/wp-content/uploads/2019/04/homs-road-8-1024x649.jpg)