Internal Piled Raft Internal Piled Raft Internal Piled Raft

Internal Piled Raft

This structure was subsiding due to inadequate foundations on poorly compacted subsoil. Shire removed the internal floor slab and then installed Shire Piles from within the structure. A reinforced concrete raft was then constructed on top of the new piles. The raft was connected to the existing walls and footings, carrying the whole load of the structure through the new concrete raft into the shire piles.

Significant savings in time and money were delivered to the Homeowner. The project was completed in 5 working days.